Commit Graph

2 Commits

Author SHA1 Message Date
dehanj
a453aae031
New plastic clip and update BOM for TP1 2023-09-01 13:41:05 +02:00
Matthew Mets
e71d70008b
TK-1 and TP-1 PCBs (#52)
* Add kicad library for flat programming clip

* Add descriptions to part symbols

* Add extended values, manufacturer/distributor info to components in mta1

* Add new board entry for TK1

* Add TP1 programmer design

* Update MTA1-USB-V1 release files to match production

* Change SPI flash memory type to XT25F08BDFIGT-S
* Change touch sensor feedback cap to 1uF
* Add manufacturer, manufacturer part number, distributor, distributor part number

* Update component values for TK1 PCB

* Use specific part # for C8
* Change flash back to Winbond part, for easier sourcing
* Change C1 to 1pF

* Fixes for production programmer PCB

* Swap GND and 5V on J3
* Replace graphic logo with text
* Rename part to 'TP-1'

* TK-1 release

* Add dimensions for PCB
* Add layer stackup for PCB
* Change PCB component origin to match expanded board
* Change schematic title to 'TK-1', update release date

* mta1-usb-v1-programmer: Add corrected part numbers for OSFC production

* Q1, Q2, F1 part subsititutions
* add mfr/supplier info for all parts

* PCB library: add parts

* Rectangular footprint for TK-1 test pads
* BOM generation script used for TK-1 and TP-1 releases

* TP-1 release

* Schematic: Add manufacturer, supplier information for all parts
* Schematic: Update name and release date
* PCB: Add PCB fabrication information
* PCB: Correct pinouts on silkscreen

* PCB library: add 'screw' and 'foot' symbols

* Screw is a schematic-only part, for including mechanical screws in the
  BOM
* Foot is for self-adhesive rubber mounting feet that can be stuck to
  the bottom of a PCB

* TP-1 release: Add screws, feet to the BOM

* Pico library: Add footprint for RPi Pico w/solder paste

* TP-1 RevA release updates:

* Add fiducials in 3 corners (1mm exposed copper ring w/2mm soldermask opening)
* Add solder paste openings to Raspberry Pi Pico pads

* TK-1: RevA.1 release

* Add two fiducials to TK-1 board

* TP-1: Update fuse type to match actual part

* Make placement diagrams for TP-1, TK-1

* Update BC-1-xxx footprints to include placement outlines
* Update TP-1 PCB with new footprints, clean up top fab layer
* Take screenshots of top layers of both boards

* tk-1: fix placement footprints

* Add pin1 marking for ncp footprint
* Add refdes for w25q80 footprint
* Update board with new footprints, clear extraneous text on fab layer
2022-12-22 16:41:46 +01:00