mirror of
https://github.com/nhammer514/textfiles-politics.git
synced 2024-12-28 16:59:25 -05:00
317 lines
16 KiB
Plaintext
317 lines
16 KiB
Plaintext
|
1
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
Testimony of Dr. Arjun Makhijani on the Programmatic
|
|||
|
Environmental Impact Statement for the Proposed Reconfiguration
|
|||
|
of the Nuclear Weapons Complex, given at Washington, D.C., June
|
|||
|
12, 1991.
|
|||
|
|
|||
|
|
|||
|
|
|||
|
My name is Arjun Makhijani. I am representing the Institute
|
|||
|
for Energy and Environmental Research of Takoma Park, Maryland,
|
|||
|
of which I am the president. I appreciate this opportunity to
|
|||
|
present my views. I am submitting a written statement for the
|
|||
|
record.
|
|||
|
|
|||
|
There are a number of overarching issues regarding the
|
|||
|
scientific and technical content and integrity of the
|
|||
|
Programmatic Environmental Impact Statement which must be
|
|||
|
addressed so that the range of reconfiguration options
|
|||
|
corresponds to the reality of a rapidly changing world and the
|
|||
|
immense needs for money and technical resources of the problems
|
|||
|
of nuclear and non-nuclear hazardous wastes which have already
|
|||
|
been created from past weapons production. The scope proposed by
|
|||
|
the DOE for the reconfiguration PEIS is fundamentally deficient
|
|||
|
on a number of grounds.
|
|||
|
|
|||
|
The most fundamental deficiency has already been much
|
|||
|
discussed as part of extensive and repeated public comments on
|
|||
|
the scope of the Environmental Restoration and Waste Management
|
|||
|
PEIS -- the modernization PEIS and Environmental
|
|||
|
Restoration/Waste Management PEIS need to be a part of a single
|
|||
|
interconnected document. Despite these many comments the DOE is
|
|||
|
single-mindedly pursuing and original, flawed decision to do two
|
|||
|
documents, each highly flawed in its own concept, in large
|
|||
|
measure because of the failure to properly consider nuclear waste
|
|||
|
issues.
|
|||
|
|
|||
|
Risk Minimization
|
|||
|
|
|||
|
In my own comments on the scope of the Environmental
|
|||
|
Restoration and Waste Management PEIS, I had noted that risk
|
|||
|
|
|||
|
2
|
|||
|
|
|||
|
|
|||
|
minimization should be a primary goal of the entire PEIS. This
|
|||
|
should include the approach to the problem, the way in which
|
|||
|
scenarios are set and may other aspects of environmental
|
|||
|
evaluation. One of the most basic aspects of risk minimization,
|
|||
|
as I noted in my testimony of January 14, 1991, is that it "is
|
|||
|
not only each risk from each operation that is to be reduced.
|
|||
|
Rather, a programmatic statement is done precisely because we
|
|||
|
seek to minimize overall risk." This cannot be done if
|
|||
|
modernization, production for existing plants and risks from past
|
|||
|
activities are considered separately.
|
|||
|
|
|||
|
During that same process of comment on the scope of the
|
|||
|
Environmental Restoration and Waste Management PEIS, some twenty
|
|||
|
groups sent a letter to Secretary Watkins asserting that it would
|
|||
|
be absurd and unacceptable to consider a clean-up plan which
|
|||
|
excluded waste generation from new weapons production activities.
|
|||
|
It is similarly absurd and unacceptable to exclude crucial waste
|
|||
|
management aspects from an environmental impact statement about
|
|||
|
modernization that claims to be a "programmatic" statement.
|
|||
|
|
|||
|
Waste Management Impacts
|
|||
|
|
|||
|
There are a number of practical problems which arise out of
|
|||
|
the omission of critical waste management issues. First, some of
|
|||
|
the waste generated may need to be sent either to high-level
|
|||
|
waste repository or to a transuranic waste repository. Space
|
|||
|
considerations for these repositories, waste forms, geologic
|
|||
|
isolation criteria for specific waste forms, and many other
|
|||
|
factors will impact on the environment and the health of future
|
|||
|
generations. Yet, both Yucca Mountain and the Waste Isolation
|
|||
|
Pilot Project are excluded from the scope of the modernization
|
|||
|
PEIS. Indeed, the modernization PEIS does not even consider one
|
|||
|
of the most important elements of the proposed modernization --
|
|||
|
the New Production Reactor.
|
|||
|
|
|||
|
The excuse for excluding the NPR is the same as that for
|
|||
|
excluding Yucca Mountain and WIPP -- that they are the subjects
|
|||
|
of separate EIS processes. Yet it defeats the purpose of a
|
|||
|
programmatic statement if the interactions and implications of
|
|||
|
critical aspects of the program are not considered. The New
|
|||
|
Production Reactor will have spent fuel driver rods, possibly
|
|||
|
reprocessing wastes, "low-level" wastes, decommissioning wastes,
|
|||
|
as well as emissions to the environment from routine operations.
|
|||
|
While the modernization PEIS excludes the NPR and associated
|
|||
|
wastes from its scope, the NPR draft EIS in its turn also
|
|||
|
excludes environmental impacts from reprocessing driver rods, as
|
|||
|
well as high-level waste repository impacts. Thus, among the
|
|||
|
most serious radioactive waste impacts of tritium production and
|
|||
|
possible associated uranium and plutonium recovery have been
|
|||
|
neatly sidestepped in this way. DOE should have incorporated
|
|||
|
these obvious aspects into a programmatic statement on its own.
|
|||
|
Not only has it failed to meet the obvious, minimum test of
|
|||
|
technical completeness for a programmatic statement, it continues
|
|||
|
|
|||
|
3
|
|||
|
|
|||
|
|
|||
|
to repeatedly ignore suggestions that would enable a minimally
|
|||
|
complete PEIS to be done. This is hardly indicative of a new
|
|||
|
culture committed to environmental protection above all else.
|
|||
|
Rather it looks, walks and quacks like the same old production-
|
|||
|
oriented duck.
|
|||
|
|
|||
|
Unfunded Obligations from Past Production
|
|||
|
|
|||
|
The U.S. government, through its DOE budget owes the nuclear
|
|||
|
waste fund a very substantial sum of money for disposal costs of
|
|||
|
high level radioactive waste from weapons production in the
|
|||
|
repository. According to Ron Callen, the director of the Nuclear
|
|||
|
Waste Program Assessment office of the national Association of
|
|||
|
Regulatory Utility Commissioners, the DOE owes about one billion
|
|||
|
dollars to this fund and this amount is increasing, since
|
|||
|
interest on this obligation is accruing. The DOE has only
|
|||
|
contributed $5 million into this Fund so far, a laughable sum
|
|||
|
compared to even the level of obligation of about $500 million
|
|||
|
which it itself acknowledges.
|
|||
|
|
|||
|
The DOE has also reneged on its promise in its first Five
|
|||
|
Year Plan to contribute $200 million per year into this fund. It
|
|||
|
may be that this is due to the general stringency in which the
|
|||
|
present budgetary decisions are being made that these obligations
|
|||
|
to the Nuclear Waste Fund are not being met. But that only
|
|||
|
illustrates the point that I have made that it is precisely
|
|||
|
because there are substantial unfunded and underfunded
|
|||
|
liabilities relating to past waste and pollution that the DOE and
|
|||
|
the U.S. government should set aside all monies proposed to be
|
|||
|
devoted to modernization to a special cleanup fund. The
|
|||
|
obligations to the Nuclear Waste Fund should be met forthwith.
|
|||
|
|
|||
|
Size of the U.S. Nuclear Arsenal
|
|||
|
|
|||
|
The requirements for nuclear weapons materials as defined by
|
|||
|
the Pentagon have been changing very rapidly due to the evolving
|
|||
|
international situation. Thus, a couple of years ago, a
|
|||
|
substantial downsizing of the arsenal was not even under
|
|||
|
consideration. Yet DOE is now considering scenarios with an
|
|||
|
arsenal 15% of the size of the present one. To propose to invest
|
|||
|
huge sums of money in a new weapons complex when superpower
|
|||
|
military tensions have declined drastically and indeed when they
|
|||
|
have even collaborated on settling conflicts around the world
|
|||
|
would appear to be financially imprudent, especially in a time
|
|||
|
when other social and environmental needs are unmet. This is not
|
|||
|
mere speculation. DOE has in the past few years spent hundreds
|
|||
|
of millions of dollars trying to restore facilities which are not
|
|||
|
required due to the changing international situation. DOE has
|
|||
|
yet to analyze this experience and examine its implications for
|
|||
|
the modernization program.
|
|||
|
|
|||
|
It must be borne in mind that the proposed new nuclear
|
|||
|
weapons complex is supposed to provide for U.S. nuclear weapons
|
|||
|
|
|||
|
4
|
|||
|
|
|||
|
|
|||
|
requirements until around the middle of the next century.
|
|||
|
Planning for such a long time horizon is a chancy business under
|
|||
|
any circumstances. Doing so in the present circumstances when
|
|||
|
the political assumptions upon which the arsenal has been based
|
|||
|
have been changing very rapidly is like trying to predict the
|
|||
|
course of Alice in Wonderland as she enters the rabbit hole. It
|
|||
|
might be an interesting exercise, but one wouldn't want to bet
|
|||
|
tens of billions of dollars of public money on it. It is all the
|
|||
|
more shocking that this is being pursued without serious
|
|||
|
consideration or discussion of the financial and political risk.
|
|||
|
|
|||
|
Non-proliferation Considerations
|
|||
|
|
|||
|
The political and military risk could be considerable. To
|
|||
|
begin to spend billions of dollars on a new nuclear weapons
|
|||
|
production complex when the United States already has 20,000
|
|||
|
nuclear weapons could be regarded in the Third World, and perhaps
|
|||
|
even in certain quarters in the Soviet Union as a highly
|
|||
|
provocative act at a time when the U.S. is proclaiming interest
|
|||
|
in nuclear non-proliferation and superpower cooperation. Even
|
|||
|
before this, the nuclear non-proliferation talks for the renewal
|
|||
|
of the treaty are mired in controversy over the failure of the
|
|||
|
U.S. to even negotiate for a comprehensive test ban and the
|
|||
|
practical failure of the superpowers to substantially reduce
|
|||
|
their nuclear arsenals.
|
|||
|
|
|||
|
At the same time we have the spectacle of one of the
|
|||
|
superpowers, the Soviet Union, asking for hundreds of billions of
|
|||
|
dollars in aid from the other. Such sums would hardly be given
|
|||
|
serious consideration if the Soviet Union did not possess and
|
|||
|
vast nuclear arsenal. Much less would major Third World
|
|||
|
countries' leaders be given serious consideration should they ask
|
|||
|
to be present at the economic summit of the major economic
|
|||
|
powers. The implications of this are surely not lost on
|
|||
|
potential nuclear weapons powers in the Third World.
|
|||
|
|
|||
|
Even these few basic preliminaries regarding non-
|
|||
|
proliferation questions lead to the conclusion that embarking on
|
|||
|
a modernization of the U.S. nuclear weapons complex is a highly
|
|||
|
risky, politically and militarily. The world has changed too
|
|||
|
fast for the implications of this to be thought through
|
|||
|
sufficiently to arrive at conclusions regarding the size of the
|
|||
|
U.S. arsenal, even according to criteria of the Pentagon.
|
|||
|
Indeed, the very criteria are in flux; if they are not, they
|
|||
|
should be because the world situation is changing so fast.
|
|||
|
|
|||
|
Conclusions
|
|||
|
|
|||
|
The fact that so much has been said on the subject of
|
|||
|
integrating the two PEIS statements, that it makes eminent
|
|||
|
technical and environmental sense, and that the DOE has continued
|
|||
|
to ignore it outright shows that despite a great deal of talk
|
|||
|
about public participation, change in culture at DOE and so on,
|
|||
|
|
|||
|
5
|
|||
|
|
|||
|
|
|||
|
there has been little practical cognizance of public comment or
|
|||
|
actual change in culture whenever it touches upon nuclear weapons
|
|||
|
production. The DOE continues to pursue goals and means that it
|
|||
|
has already decided, regardless of public comment, so that public
|
|||
|
comment is turning into a farce.
|
|||
|
|
|||
|
In addition to the futile expenditures which DOE has already
|
|||
|
made on facilities which it will never use, there is problem of
|
|||
|
whether there will be sufficient money and technical resources
|
|||
|
available for clean-up in future years. Clearly, there is
|
|||
|
considerable uncertainty whether the clean-up program can be
|
|||
|
adequately funded in the long-term, even if DOE cannot
|
|||
|
efficiently spend much more money today. It would therefore be
|
|||
|
prudent to set aside considerable sums of money for the long-term
|
|||
|
clean-up program at the present time when there is no clear
|
|||
|
justification for spending money on new production facilities and
|
|||
|
when it would be politically prudent to await further
|
|||
|
developments over the next three years in terms of U.S.-Soviet
|
|||
|
relations and other international political and military issues.
|
|||
|
|
|||
|
I recommend that all expenditures on modernization be halted
|
|||
|
for three years and that such a scenario be explicitly considered
|
|||
|
in the modernization PEIS. The total halting of production
|
|||
|
activities in the present nuclear weapons complex should also be
|
|||
|
part of this scenario. Activities related to reducing the size
|
|||
|
of the arsenal should, of course be considered, and various
|
|||
|
levels should be incorporated, as part of these same
|
|||
|
considerations. Any new facilities needed for reducing arsenal
|
|||
|
size, as distinct from modernization should be clearly specified
|
|||
|
and clearly distinguished from new production or refurbishing of
|
|||
|
old weapons into new designs. If the DOE feels that any of the
|
|||
|
facilities associated with the modernization PEIS may be relevant
|
|||
|
to clean-up these should be justified only on the grounds of its
|
|||
|
being the best available technology for clean-up and have no
|
|||
|
production related component. It is unacceptable for DOE to
|
|||
|
continue to hide production under the guise of clean-up.
|
|||
|
|
|||
|
During this time the implications of the U.S. nuclear
|
|||
|
program for building a new nuclear weapons complex for waste
|
|||
|
management, for the environment, for nuclear non-proliferation,
|
|||
|
for U.S.-Soviet relations, for contingencies related to the
|
|||
|
possible political break-up of the Soviet Union should all be
|
|||
|
examined more carefully and thoroughly. The latter aspects are
|
|||
|
not the charge of the DOE, of course, but the modernization
|
|||
|
program is profoundly affected by them. A more careful, prudent
|
|||
|
course is much more desirable than the spectacle of spending huge
|
|||
|
sums of public money on scenarios for arsenal size which change
|
|||
|
wildly from year to year.
|
|||
|
|
|||
|
The funds now earmarked for modernization should be set
|
|||
|
aside in a fund earmarked for clean-up, analogous to the nuclear
|
|||
|
waste fund. In fact, I recommend that some of the funds
|
|||
|
earmarked for production should be put into the nuclear waste
|
|||
|
|
|||
|
6
|
|||
|
|
|||
|
|
|||
|
fund to which the DOE has already huge unfunded obligations.
|
|||
|
This issue is worth considering in some detail as it concerns the
|
|||
|
failure of the DOE and the U.S. government to attend to waste
|
|||
|
management costs for past operations while charging ahead with
|
|||
|
plans for further production.
|
|||
|
|
|||
|
Then instead of having increasing labilities and wastes, we
|
|||
|
will in a position that some interest will be to accrue to the
|
|||
|
clean-up program from these funds which have been set aside.
|
|||
|
This will enable us to begin to meet at least in some modest
|
|||
|
measure our commitment to future generations of leaving them a
|
|||
|
safer, healthier and more peaceful world. Thank you.
|
|||
|
|