mirror of
https://github.com/QubesOS/qubes-doc.git
synced 2024-10-01 01:25:40 -04:00
Clean up text
This commit is contained in:
parent
3ed8aba54c
commit
99423ca82e
@ -72,27 +72,27 @@ are introduced in the next minor release (e.g., `3.1`). Any
|
|||||||
backward-incompatible changes are introduced in the next major release (e.g.,
|
backward-incompatible changes are introduced in the next major release (e.g.,
|
||||||
`4.0`).
|
`4.0`).
|
||||||
|
|
||||||
Issues in our [issue tracker](/doc/issue-tracking/) are sorted by release
|
Please see [issue tracking](/doc/issue-tracking/) for information about how
|
||||||
[milestones](/doc/issue-tracking/#milestones).
|
releases are handled in the issue tracker.
|
||||||
|
|
||||||
## Release schedule
|
## Release schedule
|
||||||
|
|
||||||
There is no specific schedule for releases other that more general roadmap.
|
There is no specific schedule for releases other than a general roadmap.
|
||||||
When time comes, Supreme Committee declares feature freeze and tags `-rc1` and
|
When the time comes, we declare a feature freeze, tag `-rc1`, and
|
||||||
releases ISO image. From this time on, no new features are accepted. Also a
|
release an ISO. From this point on, no new features are accepted, and our
|
||||||
strict time schedule kicks in.
|
schedule begins.
|
||||||
|
|
||||||
Each release candidate period is as follows. For the first two weeks we accept
|
Each release candidate period is as follows: For the first two weeks, we accept
|
||||||
and assign bug reports to be fixed before next release candidate. For the next
|
and assign bug reports to be fixed before the next release candidate. For the
|
||||||
two weeks we generally focus on fixing assigned bug reports, so issues
|
next two weeks, we generally focus on fixing assigned bug reports, so issues
|
||||||
discovered during this time may be postponed until later RC. Finally after that
|
discovered during this period may be postponed until a later RC. Finally,
|
||||||
there is one week of current-testing freeze, during which time no new packages
|
there is a one week current-testing freeze, during which time no new packages
|
||||||
are released, in hope that they will be installed by wider user base and
|
are released, in the hope that they will be installed and tested by wider user
|
||||||
tested.
|
base.
|
||||||
|
|
||||||
The next RC is released five weeks after the former. All packets are published
|
The next RC is released five weeks after the former. All packages are published
|
||||||
in `current` repository and the cycle starts over. There should always be at
|
in the `current` repository, and the cycle starts over. There should always be
|
||||||
least one release candidate before the final release.
|
at least one release candidate before the final release.
|
||||||
|
|
||||||
| Stage | Duration |
|
| Stage | Duration |
|
||||||
| ------------------------ | --------- |
|
| ------------------------ | --------- |
|
||||||
@ -100,11 +100,11 @@ least one release candidate before the final release.
|
|||||||
| bug fixing | two weeks |
|
| bug fixing | two weeks |
|
||||||
| `current-testing` freeze | one week |
|
| `current-testing` freeze | one week |
|
||||||
|
|
||||||
Starting with second cycle (that is, after `-rc1`) two weeks into the cycle
|
Starting with the second cycle (that is, after `-rc1`), two weeks into the cycle
|
||||||
(after primary bug-reporting period) the Supreme Committee decides whether
|
(after the primary bug-reporting period), we decide whether there should be
|
||||||
there should be another RC. If, based on remaining issues, the Committee
|
another RC. If, based on the bugs that have been reported, we decide that the
|
||||||
decides to release final, then the Committee agrees upon the release date,
|
latest RC will be designated as the stable release, then we decide on its
|
||||||
which should be no later than a week after.
|
release date, which should be no more than one week later.
|
||||||
|
|
||||||
[![Release cycle](/attachment/doc/release-cycle.svg)](/attachment/doc/release-cycle.svg)
|
[![Release cycle](/attachment/doc/release-cycle.svg)](/attachment/doc/release-cycle.svg)
|
||||||
|
|
||||||
|